Nasa Landing On The Moon 2024. Its scheduled touchdown near the moon’s south pole would be the first lunar landing of a us spacecraft since nasa’s final apollo mission in december 1972, and the. April 10, 2024 at 4:36 am pdt.
Nasa had asked for proposals of what it called the lunar terrain vehicle, or l.t.v., that could drive at speeds up to 9.3 miles per hour, travel a dozen miles on a. The mission will launch four astronauts around the moon.
Landing Scheduled For 6:24 P.m.
The lander, named odysseus and a bit bigger than a telephone booth, arrived in the south polar region of the moon at 6:23 p.m.
Nasa In January Said It Has Scheduled For September 2026 Its First Astronaut Lunar Landing Since The End Of The Apollo Program In The 1970S, With A Mission Flying Four.
It’s a lunar lab, a.
Nasa And Intuitive Machines Celebrate Moon Landing.
Images References :
Nasa Has Selected Intuitive Machines, Lunar Outpost, And Venturi Astrolab To Advance Capabilities For A Lunar Terrain Vehicle (Ltv) That Artemis Astronauts Will Use To.
Japanese officials aim to deliver it to the moon in 2031, where it will operate for 10 years.
It's A Lunar Lab, A.
Although it is a private mission, the main customer is nasa, which paid $118 million for the delivery of six instruments to the moon.